What is being built in Andhra Pradesh, and is it finished?
Every government project on record, by district, with cost, status and the official paper each figure came from.
- 729 project records. The largest by printed cost:
- Polavaram Irrigation Project: ₹55,548.87 crore as printed
- KG-DWN-98/2 Cluster - II Development Project - NELP Block: ₹34,012 crore as printed
- Visakhapatnam Metro Rail (Phase 1): ₹11,498 crore as printed
- BJR Uttarandhra Sujala Sravanthi Project: ₹8,435.27 crore as printed
- Telugu Ganga Project: ₹6,671.63 crore as printed
- Galeru Nagari Sujala Sravanthi Project (GNSS Phase-I and Phase-II): ₹6,361.92 crore as printed
- Inter-linking of Vamsadhara and Bahuda Rivers: ₹6,329.42 crore as printed
- VIJAYAWADA-GUDUR: ₹6,238.67 crore as printed
- Inter-linking of Godavari - Penna Rivers (Phase-I): ₹6,020.15 crore as printed
- Poola Subbaiah Veligonda Project: ₹6,017.99 crore as printed
- Nadikude-Srikalahasti 308.7 km: ₹5,906.03 crore as printed
- Alluri Sitarama Raju International Airport, Bhogapuram: ₹5,640 crore as printed
- Works by district:
- Alluri Sitharama Raju
- Anakapalli
- Ananthapuramu
- Annamayya
- Bapatla
- Chittoor
- Dr. B.R. Ambedkar Konaseema
- East Godavari
- Eluru
- Guntur
- Kakinada
- Krishna
- Kurnool
- Markapuram
- Nandyal
- NTR
- Palnadu
- Parvathipuram Manyam
- Polavaram
- Prakasam
- Sri Potti Sriramulu Nellore
- Sri Sathya Sai
- Srikakulam
- Tirupati
- Visakhapatnam
- Vizianagaram
- West Godavari
- YSR Kadapa
- Works that name no single district:
- Poola Subbaiah Veligonda Project (Work going on)
- Walajahpet/Ranipet to TN/AP Border Section of from Km.106.800 to Km.133.36 NH-4 (Work going on)
- Vijayawada19.50 km & Kazipet10.65 km -Byepass line (Work going on)
- Two laning with paved shoulders of Lambasingi to Paderusection of NH 516E (Work going on)
- Transmission system strengthening at Kurnool- III PS for integration of additional RE generation projects [Powergrid Kurnool III PS RE Transmission Limited] (Work going on)
- Transmission System for proposed Green Hydrogen/ Green Ammonia Projects in Kakinada Area (Phase I) (Work going on)
- Transmission System for Integration of Kurnool-IV REZ Phase-I [for 4.5 GW] [Powergrid Kurnool-IV Transmission Limited] (Work going on)
- Transmission System for Integration of Ananthapur 2 REZ Phase 1 for 4.5 GW. SPV Name Anantapuram 2 REZ Transmission Ltd (Work going on)
- South Central Railway- 3rd line between Gudur-Renigunta stations 83.17 km PB34/CR/2023-24 (Work going on)
- South Central Railway - Rail road over double line between Guntakal West-Mallapa Gate 9.64 km PB34/CR/2023-24 (Work going on)
- Six Laning of Vijayawada Bypass from Chinna Avutapalli to Gollapudi in Vijayawada - Gundugolanu Section from km. 0.00 to km. 30.00 Pkg-III (Work going on)
- Renigunta 9.60 km, Wadi 7.60 km & Gooty 3.8 km - Bypass (Work going on)
- Rehabilitation and upgradation of NH 326A from km 0/0 to 41/979 excluding km 2/255 to 3/372 and km 36/820 to 38/275 Odisha border to Narasamapeta to two lane with paved Shoulders in the State of Andhra Pradesh under NHO on EPC Mode (Work going on)
- Rehabilitation and Upgradation to 2-lane with paved shoulders configuration of Koyyuru to Chaprathipalem section Km 120000 to Km 165500 of NH-516E in the State of Andhra Pradesh under Green National Highways Corridor Project Gnhcp with the loan assistance of World Bank on EPC mode (Work going on)
- Rehabilitation and Upgradation to 2-lane with paved should ders Sir, configuration of Chaprathipalem to Lambasingi section Km 165500 to Km 205000 of NH-516E in the State of Andhra Pradesh under Green National Highways Corridor Project Gnhcp with the loan assistance of World Bank on EPC mode (Work going on)
- Rehabilitation and Up-gradation of Dhindi - Digamarru section from Km 126/510 to Km 135/740 of NH -214 New NH -216 and digamarru -Losari section from Km 0/000 tp Km 34/230 of NH-214 A New Nh-216 to two lane with paved shoulder in the state of AP-NH (Work going on)
- Rehabilitation & Upgradation of NH214 New NH-216 from Km 34/230 to Km 84/550 Losari to Machavaram Section to two lane with paved shoulder in the state of Andhrapradesh under Nhdp-IV through Engineering, Procurement& Construction EPC mode (Work going on)
- Provision of four bitumen tanks with capacity of 5 TMT each at Visakh Refinery (Work going on)
- Provision of 4G based mobile services in 7,287 uncovered villages of 44 Aspirational District across 5 states of Andhra Pradesh, Chhattisgarh, Jharkhand, Maharashtra & Odisha (Work going on)
- Old Naphtha Isomerization Unit [NIU] revamp for MS maximization at Visakh Refinery (Work going on)
- Nandigama Bypass and Kanchikacherla bypass (Work going on)
- Nadikude-Srikalahasti 308.7 km (Work going on)
- Mobile connectivity in Left Wing Extremism [LWE] affected areas-Phase2 (Work going on)
- Mobile connectivity in Left Wing Extremism [LWE] affected areas-Phase 1 Upgradation (Work going on)
- Marikuppam-Kuppam 23.7 km (Work going on)
- Krishnapatnam Node - Phase 1 - Roads and Services Development (Work going on)
- Kottavalasa-Koraput 189.278 km (Work going on)
- Kopparthy Industrial Area (Work going on)
- Khammam-Devarapalle Pkg III [4L Access Controlled Greenfield from Chintagudem village to Recherla village Design Chainage 63117 to 105236] (Work going on)
- KG-DWN-98/2 Cluster - II Development Project - Nelp Block (Work going on)
- Inter-Regional Strengthening between SR Grid and ER Grid (Work going on)
- HP-Coat [Crude to Olefins and Aromatics Technology] demo unit at Visakh Refinery (Work going on)
- Gundlakamma project (Work going on)
- Flyover between Pendurthi-Simhachalam North to avoid surface crossing at Simhachalam 7.135 km PB73/2023-24/NR (Work going on)
- ESR - 8 nos., distribution system - 216 Km, new house service connections - 38760 nos. upgrading of feeder mains, pumping station etc. - Phase II (Work going on)
- Doubling between Motumari Vishnupuram 88.81 km and Rail over Rail RoR at Motumari 10.877 Km (Work going on)
- Doubling between Gooty-Pendakallu 29.225 km PB73/2023-24/NR (Work going on)
- Construction of flyover at Gammon Junction at Km.903.265 on NH16 including vent at Diwancheruvu junction at Km.902.308 Blackspot ID No.AP03299 in Andhra Pradesh on EPC mode under NHO (Work going on)
- Construction of Paderu bypass Km 0000 to Km 13000 of 2- lane with paved shoulder on NH-516E (Work going on)
- Construction of New Domestic Terminal Building Building and miscellaneous works including maintenance, operations and Aicmc at Kadapa Airport (Work going on)
- Construction of 6 lane elevated corridor including its approaches from Km. 629880 to Km. 634470 Design Chainage of NH-16 in Ranasthalam Town portion in the state of Andhra Pradesh on EPC Mode under NHO (Work going on)
- Construction of 350 beds + 50 Super Specialty beds Esic Hospital Sheelanagar, Visakhapatnam, Andhra Pradesh (Work going on)
- Bangalore Chennai Expressway Phase-III Package I Gudipala to Walajajhpet from Km 156.000 to Km 180.000 (Work going on)
- Balance works in AP Portion and punch list items in TN & AP portion of NH-205 (Work going on)
- Access Controlled Highway of 4 Lane with Paved Shoulders from TN/AP Border Design Chainage Km 6151 to Puttur Design Chainage Km 81540 of NH-716 & 6 Lane with Paved Shoulders from Mallavaram to Renigunta (Work going on)
- 6L of Anandapuram Pendurthi Anakapalli Section from km. 681.000 to km. 731.780 of NH-16 (Work going on)
- 6L Korlam-Kantakapalle Section of NH-130CD Road from Km 421.100 to Km 445.100 Pkg-3 (Work going on)
- 6L Connectivity to Port Road from Sabbavaram Sheelanagar-NH516C (Work going on)
- 6L Access Controlled Greenfield Highway of Julekal village to Dinnedevarapadu village from Km 242.200 to Km 280.400 Pkg-2 (Work going on)
- 6L Access Controlled Greenfield Highway from Polavaram Ch. 260000 to Marripudi Ch. 285500 of [NH-544G]Package-12 (Work going on)
- 6L Access Controlled Greenfield Highway from Marripudi Ch. 285500 to Somavarappadu Ch. 314600 of [NH-544G] Package-13 (Work going on)
- 6L Access Controlled Greenfield Highway from Chandrasekharapuram Ch. 228000 to Polavaram Ch. 260000of [NH-544G] Package-11 (Work going on)
- 6 laning of Balance Work of Chennai - Tada from km. 21.40 to km. 54.40 (Work going on)
- 4L Access controlled Highway From Vakalpudi Light House to Annavaram on NH-16 section of NH-516F From Km0000 to Km40621 (Work going on)
- 4L Access Controlled Greenfield Highway section on NH-163G Khammam Vijayawada from Remidicherla village at Design Ch. 280.200 Km to Jakkampudi village on NH-16 at Design Ch. 309.909 Km Package-III (Work going on)
- 4L Access Controlled Greenfield Highway section on NH-163G Khammam Vijayawada from BrahmanapalliK village at Design Ch. 250.400 Km to Remidicherla village at Design Ch. 280.200 KmPackage-II (Work going on)
- 3rd & 4 th line Vadlapudi-Gate Jn. incl. tie line between Gangavaram Port- Visakhapatnam Steel Plant12.04 km PB73/2023-24/NR (Work going on)
- Tindivanam-Nagari 179.2 km (Work going on)
- Rayadurg-Tumkur via Kalyandurg 213 km (Work going on)
- Kurnool Coach Midlife Rehabilitation Project (Work going on)
- Kurnool - Setting up facilities for coach midlife rehabilitation workshop (Work going on)
- 6L of Gundugolanu Design km 1023.280 to Kalaparru Design km 1050.680 of NH-5 New NH-16 (Work going on)
- Widening to 2LPS of Rampachodavaram - Koyyuru Section of NH516E from KM.43.700 to KM 113.820 (Work going on)
- Vijayawada-Gudur (Work going on)
- Transmission Scheme for Solar Energy Zone in Ananthpuram (2500MW) and Kurnool (1000MW) (Work going on)
- Rehabilitation and Upgradation to 2-Lane with Paved Shoulders Configuration of Paderu- Gondiguda Sect (Work going on)
- Penukonda-Dharmavaram, Excl. Dharmavaram (41.5 KM) (Work going on)
- NH-30-Bhadrachalam to Konta Section 2LPS (Work going on)
- Multi-Product Pipeline from Krishnapatnam Coastal Installation to the Proposed Installation at Hyder (Work going on)
- Malugur-Palasamudram (17.98 KM) (PB#29/NR/2022-23) (Work going on)
- Kotlpalli-Narasapur (Nl) (Work going on)
- Hp Trijet Unit in Vr (Work going on)
- Guntur-Guntakal (Work going on)
- Dornala to Kunta Junction from Design Chainage KM 244+000 to 267+990 Section of NH-765 (Package-2) (Work going on)
- Construction of 4 Lane Access Controlled New Greenfield Highway Section of NH-365BG (Khammam-Devarap (Work going on)
- Construction of 4 Lane Access Controlled New Greenfield Highway Section of NH 365BG from Recharla VI (Work going on)
- Construction of 1 Nos ROB, 2 Nos VUPS, Service Roads, Provision of Lighting and Construction of Othe (Work going on)
- Cgd Project at Kurnool, Guntur and Prakasam Districts (Work going on)
- Augmentation of 1500MVA 3RD 765/400KV Transformation Capacity at Kurnool New Substation (Work going on)
- 6L of Pondavakkam to Kannigaipair from KM 96.040 to KM 116.100 of NH 716B (PKG-IV) (Work going on)
- 6L of Chilkararupet Bypass from KM. 357.400 to KM. 371.920 of NH-16 (Work going on)
- 6-Laning of Vijayawada Bypass from Gollapudi (Design Ch. 30+000) to Chinnakakani (Design Ch. 47+881) (Work going on)
- 4L PS from Mandlem (Existing KM. 38.000/Design KM.30.600) to Atmakur (Existing KM.73.000/Design KM 6 (Work going on)
- 4L PS from Kurnool (Existing KM. 5.400 of NH-40/Design KM.0.000) to Mandlem (Existing KM.38.000/Desi (Work going on)
- 2LPS from Gondiguda to Araku Bhallaguda KM 27.480 to KM 51.772 Section of NH 516E (Work going on)
- Venkatanagaram Pumping Scheme (Work going on)
- Vedavathi (Hagari) River Lift Irrigation Scheme (Work going on)
- Telugu Ganga Project (Work going on)
- Tadipudi Lift Irrigation Scheme (Work going on)
- Srisailam Right Branch Canal (Srbc), Gorakallu Balancing Reservoir (Stopped)
- Somasila Swarna Mukhi Link Canal (Work going on)
- Siddapuram Lift Irrigation Scheme (Stopped)
- SPC Paleru Reservoir Project (Stopped)
- Rayalaseema Lift Scheme (Sangameswaram) (Work going on)
- Pushkara Lift Irrigation Scheme (Work going on)
- Mylavaram Modernization (Stopped)
- Modernization of Pulivendula Branch Canal (PBC) System (Stopped)
- Modernization of Nagavali System (Thotapalli Old Canal system) (Work going on)
- Modernisation of Yeleru Delta System (Phase-I) (Work going on)
- Modernisation of TBP High Level & Low Level Canals (Tbphlc / Tbpllc) (Stopped)
- Modernisation of Krishna Delta System (Stopped)
- Modernisation of Godavari Delta System (Stopped)
- Handri Neeva Sujala Sravanthi Project (Hnss Phase-I and Phase-II) (Work going on)
- Guru Raghavendra (Gklis) Lift Irrigation Scheme including Micro Irrigation (Work going on)
- Gandikota - CBR Lift Scheme (Work going on)
- Galeru Nagari Sujala Sravanthi Project (Gnss Phase-I and Phase-II) (Work going on)
- Flood Banks of Vamsadhara & Nagavali (Work going on)
- Flood Banks of Krishna River (Finished)
- Flood Banks in Kurnool and Nandyal (Stopped)
- Chintalapudi Lift Irrigation Scheme (Work going on)
- BJR Uttarandhra Sujala Sravanthi Project (Work going on)
- Vissannapeta - Chanubanda Lift Irrigation Scheme (Approved)
- Varikapudisela Lift Irrigation Scheme (Approved)
- Supply of Water from Chitravathi Balancing Reservoir (CBR) to Hnss Main Canal (Approved)
- Rajolibanda Diversion Scheme (RDS) (Approved)
- Purushothapatnam Lift Irrigation Scheme (Finished)
- Pattiseema Lift Irrigation Scheme (Finished)
- New Barrage across Krishna River near Vykuntapuram (Approved)
- Muktyala Lift Irrigation Scheme (Approved)
- Lifting of Water from Jeedipalli Reservoir to Upper Pennar Project (Work going on)
- Lifting of Water from Jeedipalli Reservoir to Bhairavanithippa Project (Work going on)
- Inter-linking of Vamsadhara and Nagavali Rivers (Work going on)
- Inter-linking of Vamsadhara and Bahuda Rivers (Approved)
- Inter-linking of Nagavali River with Champavati (Work going on)
- Inter-linking of Godavari - Penna Rivers (Phase-I) (Work going on)
- Gundrevula Reservoir Project (Approved)
The full page is loading. Every number here is from a government paper.