Is Rehabilitation and Upgradation to 2-lane with paved should ders Sir, configuration of Chaprathipalem to Lambasingi section Km 165500 to Km 205000 of NH-516E in the State of Andhra Pradesh under Green National Highways Corridor Project Gnhcp with the loan assistance of World Bank on EPC mode finished?
NH-516E road works: work going on, Asr (as an older paper names it). Cost as printed ₹311.22 crore. From MoSPI report, August 2026, with the paper linked.
- Rehabilitation and Upgradation to 2-lane with paved should ders Sir, configuration of Chaprathipalem to Lambasingi section Km 165500 to Km 205000 of NH-516E in the State of Andhra Pradesh under Green National Highways Corridor Project Gnhcp with the loan assistance of World Bank on EPC mode
- Name as printed in the paper: Rehabilitation and Upgradation to 2-lane with paved should ders Sir, configuration of Chaprathipalem to Lambasingi section Km 165500 to Km 205000 of NH-516E in the State of Andhra Pradesh under Green National Highways Corridor Project GNHCP with the loan assistance of World Bank on EPC mode
- Kind of work: Roads
- Status in the record: Work going on
- Place: Asr (as an older paper names it)
- Cost as printed: ₹311.22 crore. This is the estimate in that paper, not money spent.
- Physical progress as printed: 93%
- Expected completion as printed: 1 September 2026
- Department: Roads & Highways
- Paper: MoSPI report, August 2026
- Papers on record from 1 August 2020 to 31 August 2026