What is happening in Sri Potti Sriramulu Nellore district?
Sri Potti Sriramulu Nellore district, Andhra Pradesh: its project records, official notices and facts, each from a government paper.
- Headquarters: Nellore
- Project records that name this district: 51
- Dedicated Port road to Krishnapatnam Port Package-I from Km. 0.000 to Km. 18.000 (Work going on)
- 6L Access Controlled Greenfield Highway from Narayanmpet Ch. 203500 to Chandrasekharpuram Ch. 228000Package-10 (Work going on)
- 6L Access Controlled Greenfield Highway from Kavulakuntla Ch. 196000 to Narayanmpet Ch. 203500Package-09 (Work going on)
- 4L Greenfield Road connecting North and South industrial cluster of Khandaleru Creek near Krishnapatnam port at Thamminapatnam to Mollur from Km 0.0 to Km 16.046, Part I & 6L extension of dedicated port road of NH-67 Km 18.0 to Km 19.3, Part II (Work going on)
- NH 167 B Kadapa Nellore Border to Cspuram I.e. from KM 58.635 to KM 99.409 (Work going on)
- 2LPS from KM36.400 to KM. 107.224 of NH167BG from Duttalur to Kavali Section (Work going on)
- Somasila Project (Work going on)
- Somasila High Level Canal (Phase-I and Phase-II) (Work going on)
- Modernisation of Penna Delta System (Nellore & Sangam Barrages, Kanupur and Pennar Delta canals) (Finished)
- Flood Banks in Nellore District (Swarnamukhi, Tsallakalva, Kandaleru & Kalangi) (Stopped)
- Strengthening of bund and providing Chakalipalem Kunta at 26th ward in Kandukur Municipality (Work going on)
- Strengthening of Padarupalli Cheruvu Bund, Nellore (Work going on)
- Sewer lines at Muthukur Gate Junction, Nellore (Work going on)
- Scada System, Nellore (Work going on)
- Rejuvention of Chillakuru Cheruvu, Gudur (Work going on)
- Rejuvention of Chennuru Tank, Gudur (Work going on)
- Rejuvenation of water body in Kavali (Work going on)
- Rejuvenation of Yerraguntapa lem Water Body at in Kandukur Municipality (Work going on)
- Rejuvenation of Yerragunta Harijana Palem Pond at 15th ward in Kandukur Municipality (Work going on)
- Rejuvenation of Yerra Chervuvu in 20th Ward of Buchireddipalem NP, Buchireddypalem (Work going on)
- Rejuvenation of Venkatadripalem Water Body at in Kandukur Municipality (Work going on)
- Rejuvenation of Gudur Tank (Work going on)
- Rejuvenation of Atmakur Cheruvu, Atmakur_N (Work going on)
- Rejuvenation and Restoration of Komatigunta Pond at 30th ward in Kandukur Municipality (Work going on)
- Rejuvenation and Restoration of Dubagunta Water Bodyby at dubagunta in 29th ward in Kandukur Municipality (Work going on)
- Providing water supply to weaker sections in Allur, Alluru (Work going on)
- Providing water supply infrastructure to weaker sections in Nellore (Work going on)
- Providing water supply infrastructure to weaker section areas in Kavali (Work going on)
- Providing water supply infrastructure to weaker section areas in Gudur Nellore (Work going on)
- Providing water supply infrastructure to weaker section areas in Bucchireddyp alem, Buchireddypalem (Work going on)
- Providing water supply infrastructure to weaker section areas in Atmakur- Nellore, Atmakur_N (Work going on)
- Providing Water supply infrastructure to economic weaker sections housing colonies in Kandukur Municipality (Work going on)
- Providing UGD network to housing colonies for weaker sections in Nellore Urban (Work going on)
- PVC UGD pipeline at Bhagathsingh Colony, Nellore (Work going on)
- Interconnecti ons and Missing links in Rural Constituency, Nellore (Work going on)
- Interception and diversion arrangements in CRP donka, Nellore (Work going on)
- Intercepting Drain and collection well from Bujjamma Revu to porlukatta, Nellore (Work going on)
- Improvement of Water Supply Scheme in Kandukur Municipality (Work going on)
- Development of Walking track, Kerb walls, Pavers, Lighting, Green space & Water Supply at Uddipagunta, Alluru (Work going on)
- DWC pipes from Mypadu Road Junction to Vengalreddy Nagar, Nellore (Work going on)
- Construction of interception Drain to Mallapukaluva, Nellore (Work going on)
- Comprehensive Water Supply Improvement Scheme in Buchireddipalem NP, Buchireddypalem (Work going on)
- CC Diversion drain from collector bunglow to SS tank, Nellore (Work going on)
- Augumentation of Water Supply Scheme in Allur NP, Alluru (Work going on)
- Augmentation of Water Treatment Plant, Transmission mains, Storage Reservoirs, Distribution Network and providing House Service Connections, Atmakur_N (Work going on)
- Augmentation of Water Supply Scheme in Gudur Municipality (Work going on)
- APTIDCO- Providing Water Supply Facilities at Kondlapudi and Venkateshwa rapuram in Nellore District (Work going on)
- APTIDCO- Providing Water Supply Facilities at Kondlapudi and Venkateshwa rapuram in Nellore District (Work going on)
- APTIDCO- Providing Water Supply Facilities at Kandukuru ULB of Prakasam District (Finished)
- APTIDCO- Providing 1.50 MLD STP at the location of Maddurupadu at Kavali in Nellore District (Finished)
- 24X7 Water Supply project, Nellore (Work going on)
- Sri Potti Sriramulu Nellore district paper