AP Fact Check · తెలుగు

Is Transmission system strengthening at Kurnool- III PS for integration of additional RE generation projects [Powergrid Kurnool III PS RE Transmission Limited] finished?

Kurnool power lines: work going on, District: still being checked in official papers. Cost as printed ₹2,886 crore.

The full page is loading. Every number here is from a government paper.