Is 4L PS from Mandlem (Existing KM. 38.000/Design KM.30.600) to Atmakur (Existing KM.73.000/Design KM 6 finished?
Atmakur road works: work going on, District: still being checked in official papers. Cost as printed ₹887.28 crore.
- 4L PS from Mandlem (Existing KM. 38.000/Design KM.30.600) to Atmakur (Existing KM.73.000/Design KM 6
- Name as printed in the paper: 4L PS FROM MANDLEM (EXISTING KM. 38.000/DESIGN KM.30.600) TO ATMAKUR (EXISTING KM.73.000/DESIGN KM 6
- Kind of work: Roads
- Status in the record: Work going on
- Place: District: still being checked in official papers
- Cost as printed: ₹887.28 crore. This is the estimate in that paper, not money spent.
- Physical progress as printed: 89.2%
- Expected completion as printed: 1 October 2025
- Department: Road Transport And Highways
- Paper: MoSPI report, June 2025
- Papers on record from 1 March 2023 to 30 June 2025