AP Fact Check · తెలుగు

Is 6L Access Controlled Greenfield Highway from Odulapalle Ch. 72000 to Nallacheruvu- palli Ch. 96300 of [NH-544G]Package-4 finished?

NH-544G road works: work going on, Sri Sathya Sai, YSR Kadapa. Cost as printed ₹946.1 crore. From MoSPI report, August 2026, with the paper linked.

The full page is loading. Every number here is from a government paper.