AP Fact Check · తెలుగు

Is 6L Access Controlled Greenfield Highway from Vanavolu Ch. 24300 to Vankarakunta Ch. 45700 of [NH-544G] Package-2 finished?

Vanavolu to Vankarakunta road works: work going on, Sri Sathya Sai. Cost as printed ₹626.91 crore. From MoSPI report, August 2026, with the paper linked.

The full page is loading. Every number here is from a government paper.