Is Rehabilitation and Up-gradation of existin of road from 2-lane to 2-lane with paved shoulders from km. 0.00 to km 53.590 total length-53.590 km of Raychoti to Vempalli section of NH-440 in the State of Andhra Pradesh on EPC mode finished?
NH-440 road works: work going on, Annamayya, YSR Kadapa. Cost as printed ₹359.52 crore. From MoSPI report, August 2026, with the paper linked.
- Rehabilitation and Up-gradation of existin of road from 2-lane to 2-lane with paved shoulders from km. 0.00 to km 53.590 total length-53.590 km of Raychoti to Vempalli section of NH-440 in the State of Andhra Pradesh on EPC mode
- Name as printed in the paper: Rehabilitation and Up-gradation of existin of road from 2-lane to 2-lane with paved shoulders from km. 0.00 to km 53.590 total length-53.590 km of Raychoti to Vempalli section of NH-440 in the State of Andhra Pradesh on EPC mode.
- Kind of work: Roads
- Status in the record: Work going on
- Place: Annamayya, YSR Kadapa
- Cost as printed: ₹359.52 crore. This is the estimate in that paper, not money spent.
- Physical progress as printed: 90.2%
- Expected completion as printed: 1 September 2026
- Department: Roads & Highways
- Paper: MoSPI report, August 2026
- Papers on record from 1 December 2021 to 31 August 2026
- More works in Annamayya district
- Madanapalli road works
- Cuddapah road works
- Cuddapah road works
- More works in YSR Kadapa district
- Nellore road works
- Nandyal road works
- Muddanur to B. Kothapalli section road works
- Jammalamadugu road works
The full page is loading. Every number here is from a government paper.