AP Fact Check · తెలుగు

Is 6L Access Controlled Greenfield Highway from Vankarakunta Ch. 45700 to Odulapalle Ch. 72000 of [NH-544G]Package-3 finished?

Vankarakunta to Odulapalle road works: work going on, Sri Sathya Sai. Cost as printed ₹888.07 crore. From MoSPI report, August 2026, with the paper linked.

The full page is loading. Every number here is from a government paper.