AP Fact Check · తెలుగు

Is Kondamodu to Perecherla Section Design Ch. Km 000 to Km 49917 of NH-167AG to to 4LPS finished?

Kondamodu to Perecherla road works: work going on, Guntur, Palnadu. Cost as printed ₹881.61 crore. From MoSPI report, August 2026, with the paper linked.

The full page is loading. Every number here is from a government paper.