Is Vodarevu-Chilakaluripet Section (Design Chainage 0+00 to 47+000) of NH-167A (Package-I) finished?
Chilakaluripeta road works: work going on, Bapatla, Palnadu. Cost as printed ₹1,064.24 crore. From MoSPI report, June 2025, with the paper linked.
- Vodarevu-Chilakaluripet Section (Design Chainage 0+00 to 47+000) of NH-167A (Package-I)
- Name as printed in the paper: VODAREVU-CHILAKALURIPET SECTION (DESIGN CHAINAGE 0+00 TO 47+000) OF NH-167A (PACKAGE-I)
- Kind of work: Roads
- Status in the record: Work going on
- Place: Bapatla, Palnadu
- Cost as printed: ₹1,064.24 crore. This is the estimate in that paper, not money spent.
- Expected completion as printed: 1 February 2026
- Department: Road Transport And Highways
- Paper: MoSPI report, June 2025
- Papers on record from 1 August 2023 to 30 June 2025
- More works in Bapatla district
- Somavarappadu to Muppavaram road works
- More works in Palnadu district
- Kondamodu to Perecherla road works
- Dachepalli road works
- Davualapally to Mallapalem Section
The full page is loading. Every number here is from a government paper.