Is Davualapally to Mallapalem Section [design Ch. KM 133+922 to KM 154+216 (Existing Ch. KM 133+922 to finished?
Davualapally to Mallapalem Section: work going on, Palnadu. Cost as printed ₹393.61 crore. From MoSPI report, June 2025, with the paper linked.
- Davualapally to Mallapalem Section [design Ch. KM 133+922 to KM 154+216 (Existing Ch. KM 133+922 to
- Name as printed in the paper: DAVUALAPALLY TO MALLAPALEM SECTION {DESIGN CH. KM 133+922 TO KM 154+216 (EXISTING CH. KM 133+922 TO
- Kind of work: Roads
- Status in the record: Work going on
- Place: Palnadu
- Cost as printed: ₹393.61 crore. This is the estimate in that paper, not money spent.
- Expected completion as printed: 1 February 2026
- Department: Road Transport And Highways
- Paper: MoSPI report, June 2025
- Papers on record from 1 January 2024 to 30 June 2025
- More works in Palnadu district
- Kondamodu to Perecherla road works
- Chilakaluripeta road works
- Dachepalli road works