AP Fact Check · తెలుగు

Is 6L Access Controlled Greenfield Highway from Kodur Ch. 0000 to Vanavolu Ch. 24300 of [NH-544G] Package-1 finished?

Kodur to Vanavolu road works: work going on, Sri Sathya Sai. Cost as printed ₹798.25 crore. From MoSPI report, August 2026, with the paper linked.

The full page is loading. Every number here is from a government paper.