Is Flood Banks in Nellore District (Swarnamukhi, Tsallakalva, Kandaleru & Kalangi) finished?
Nellore irrigation works: stopped, Sri Potti Sriramulu Nellore. Cost as printed ₹652.7 crore. From Socio-Economic Survey 2024-25, with the paper linked.
- Flood Banks in Nellore District (Swarnamukhi, Tsallakalva, Kandaleru & Kalangi)
- Kind of work: Irrigation
- Status in the record: Stopped
- Place: Sri Potti Sriramulu Nellore
- Cost as printed: ₹652.7 crore. This is the estimate in that paper, not money spent.
- Physical progress as printed: 50%
- Department: Water Resources Department, Government of Andhra Pradesh
- Paper: Socio-Economic Survey 2024-25
- Papers on record from 31 March 2019 to 31 December 2024
- More works in Sri Potti Sriramulu Nellore district
- Somasila Project
- Somasila High Level Canal
- Nellore irrigation works
The full page is loading. Every number here is from a government paper.