Rehabilitation and Upgradation to 2-lane with paved should ders Sir, configuration of Chaprathipalem to Lambasingi section Km 165500 to Km 205000 of NH-516E in the State of Andhra Pradesh under Green National Highways Corridor Project Gnhcp with the loan assistance of World Bank on EPC mode: పూర్తయిందా?
NH-516E road works: పనులు జరుగుతున్నాయి, Asr (పాత పత్రంలో పేరు). ముద్రించిన వ్యయం ₹311.22 కోట్లు. ఆధారం: MoSPI report, August 2026.
- Rehabilitation and Upgradation to 2-lane with paved should ders Sir, configuration of Chaprathipalem to Lambasingi section Km 165500 to Km 205000 of NH-516E in the State of Andhra Pradesh under Green National Highways Corridor Project Gnhcp with the loan assistance of World Bank on EPC mode
- పత్రంలో ముద్రించిన పేరు: Rehabilitation and Upgradation to 2-lane with paved should ders Sir, configuration of Chaprathipalem to Lambasingi section Km 165500 to Km 205000 of NH-516E in the State of Andhra Pradesh under Green National Highways Corridor Project GNHCP with the loan assistance of World Bank on EPC mode
- పని రకం: రోడ్లు
- రికార్డులో స్థితి: పనులు జరుగుతున్నాయి
- ప్రాంతం: Asr (పాత పత్రంలో పేరు)
- ముద్రించిన వ్యయం: ₹311.22 కోట్లు. ఇది ఆ పత్రంలోని అంచనా, ఖర్చు చేసిన డబ్బు కాదు.
- ముద్రించిన భౌతిక పురోగతి: 93%
- ముద్రించిన పూర్తి గడువు: 2026 సెప్టెంబర్ 1
- శాఖ: Roads & Highways
- పత్రం: MoSPI report, August 2026
- 2020 ఆగస్టు 1 నుంచి 2026 ఆగస్టు 31 వరకు పత్రాలు రికార్డులో ఉన్నాయి