AP Fact Check · తెలుగు

Is 6L Access Controlled Greenfield Highway from Audireddipalle Ch. 160000 to Mallapalle Ch. 176000Package-07 finished?

Audireddipalle to Mallapalle road works: work going on, YSR Kadapa. Cost as printed ₹848.06 crore. From MoSPI report, August 2026, with the paper linked.

The full page is loading. Every number here is from a government paper.