AP Fact Check · తెలుగు

Is Rejuvenation of Bandar Canal, Vijayawada finished?

Vijayawada water body works: work going on, NTR. Cost as printed ₹6.5 crore. From AMRUT list, Union Housing and Urban Affairs Ministry, with the paper linked.

The full page is loading. Every number here is from a government paper.