AP Fact Check · తెలుగు

Is Upgradation of STPs at Ajith Singh Nagar (20+40 MLD), Jakkampudi (20+20 MLD) and RL Nagar (10 MLD) & DP Stations Infrastructure, Scada etc., to NGT norms., Vijayawada finished?

Vijayawada sewage works: work going on, NTR. Cost as printed ₹89.65 crore. From AMRUT list, Union Housing and Urban Affairs Ministry, with the paper linked.

The full page is loading. Every number here is from a government paper.