Is Comprehensive drinking water supply to the Eluru town including 7 merged villages finished?
Eluru water supply: work going on, Eluru. Cost as printed ₹143.13 crore. From AMRUT list, Union Housing and Urban Affairs Ministry, with the paper linked.
- Comprehensive drinking water supply to the Eluru town including 7 merged villages
- Kind of work: Towns and cities
- Status in the record: Work going on
- Place: Eluru
- Cost as printed: ₹143.13 crore. This is the estimate in that paper, not money spent.
- Expected completion as printed: 1 March 2028
- Department: Urban Development — AMRUT 2.0 (MoHUA)
- Paper: AMRUT list, Union Housing and Urban Affairs Ministry
- More works in Eluru district
- Eluru Pumpula Cheruvu
- Eluru Ponangi Pedda Cheruvu
- Eluru water body works
- Eluru Kotha Cheruvu
The full page is loading. Every number here is from a government paper.