Is Laying of 110 /160/200 mm dia HDPE distribution lines and providing HSC connections under AMRUT 2.0, Chintalapudi finished?
Eluru urban works: work going on, Eluru. Cost as printed ₹9.12 crore. From AMRUT list, Union Housing and Urban Affairs Ministry, with the paper linked.
- Laying of 110 /160/200 mm dia HDPE distribution lines and providing HSC connections under AMRUT 2.0, Chintalapudi
- Name as printed in the paper: Laying of 110 /160/200 mm dia HDPE distribution lines and providing HSC connections under AMRUT 2.0 — Chintalapudi
- Kind of work: Towns and cities
- Status in the record: Work going on
- Place: Eluru
- Cost as printed: ₹9.12 crore. This is the estimate in that paper, not money spent.
- Expected completion as printed: 1 December 2026
- Department: Urban Development — AMRUT 2.0 (MoHUA)
- Paper: AMRUT list, Union Housing and Urban Affairs Ministry
- More works in Eluru district
- Eluru Pumpula Cheruvu
- Eluru Ponangi Pedda Cheruvu
- Eluru water body works
- Eluru Kotha Cheruvu
The full page is loading. Every number here is from a government paper.