AP Fact Check · తెలుగు

Is Laying of 110 /160/200 mm dia HDPE distribution lines and providing HSC connections under AMRUT 2.0, Chintalapudi finished?

Eluru urban works: work going on, Eluru. Cost as printed ₹9.12 crore. From AMRUT list, Union Housing and Urban Affairs Ministry, with the paper linked.

The full page is loading. Every number here is from a government paper.