Is Replacement of old 100 mm dia AC & 90mm HDPE Distribution pipe lines with providing 160 mm & 110 mm dia HDPE at various locations, GVMC finished?
Visakhapatnam urban works: finished, Visakhapatnam. Cost as printed ₹2.5 crore.
- Replacement of old 100 mm dia AC & 90mm HDPE Distribution pipe lines with providing 160 mm & 110 mm dia HDPE at various locations, GVMC
- Name as printed in the paper: Replacement of old 100 mm dia AC & 90mm HDPE Distribution pipe lines with providing 160 mm & 110 mm dia HDPE at various locations — GVMC
- Kind of work: Towns and cities
- Status in the record: Finished
- Place: Visakhapatnam
- Cost as printed: ₹2.5 crore. This is the estimate in that paper, not money spent.
- Physical progress as printed: 100%
- Department: Urban Development — AMRUT 2.0 (MoHUA)
- Paper: AMRUT list, Union Housing and Urban Affairs Ministry
- More works in Visakhapatnam district
- Visakhapatnam water supply
- Visakhapatnam water supply
- Visakhapatnam water supply
- Visakhapatnam water supply
The full page is loading. Every number here is from a government paper.