Is Replacement of old 160 mm and 200mm dia HDPE Gravity mains with providing 150mm and 200mm dia D.I Pipe line at Aganampudi, Duvvada and Vedullanarava, GVMC finished?
Visakhapatnam urban works: work going on, Visakhapatnam. Cost as printed ₹3.6 crore.
- Replacement of old 160 mm and 200mm dia HDPE Gravity mains with providing 150mm and 200mm dia D.I Pipe line at Aganampudi, Duvvada and Vedullanarava, GVMC
- Name as printed in the paper: Replacement of old 160 mm and 200mm dia HDPE Gravity mains with providing 150mm and 200mm dia D.I Pipe line at Aganampudi, Duvvada and Vedullanarava — GVMC
- Kind of work: Towns and cities
- Status in the record: Work going on
- Place: Visakhapatnam
- Cost as printed: ₹3.6 crore. This is the estimate in that paper, not money spent.
- Expected completion as printed: 1 December 2026
- Department: Urban Development — AMRUT 2.0 (MoHUA)
- Paper: AMRUT list, Union Housing and Urban Affairs Ministry
- More works in Visakhapatnam district
- Visakhapatnam water supply
- Visakhapatnam water supply
- Visakhapatnam water supply
- Visakhapatnam water supply
The full page is loading. Every number here is from a government paper.