AP Fact Check · తెలుగు

Is Taraka Rama Theertha Sagar Project finished?

Vizianagaram irrigation works: work going on, Vizianagaram. Cost as printed ₹471.31 crore. From Socio-Economic Survey 2024-25, with the paper linked.

The full page is loading. Every number here is from a government paper.