Is Rehabilitation and up-gradation of NH-167 from Km 14/900 to Km70/000 Design Ch. 14/900 to 69/700 Chintakunta to Adoni section to two lane with paved shoulders in the State of Andhra Pradesh under Corridor Approach through Engineering, Procurement finished?
Adoni road works: work going on, Kurnool. Cost as printed ₹290.15 crore. From MoSPI report, August 2026, with the paper linked.
- Rehabilitation and up-gradation of NH-167 from Km 14/900 to Km70/000 Design Ch. 14/900 to 69/700 Chintakunta to Adoni section to two lane with paved shoulders in the State of Andhra Pradesh under Corridor Approach through Engineering, Procurement
- Kind of work: Roads
- Status in the record: Work going on
- Place: Kurnool
- Cost as printed: ₹290.15 crore. This is the estimate in that paper, not money spent.
- Physical progress as printed: 91.9%
- Expected completion as printed: 1 December 2026
- Department: Roads & Highways
- Paper: MoSPI report, August 2026
- Papers on record from 1 November 2016 to 31 August 2026
- More works in Kurnool district
- Somayajulapalli - Dhone Section
- Adoni road works
The full page is loading. Every number here is from a government paper.