AP Fact Check · తెలుగు

Is Rehabilitation and up-gradation of NH-167 from Km 14/900 to Km70/000 Design Ch. 14/900 to 69/700 Chintakunta to Adoni section to two lane with paved shoulders in the State of Andhra Pradesh under Corridor Approach through Engineering, Procurement finished?

Adoni road works: work going on, Kurnool. Cost as printed ₹290.15 crore. From MoSPI report, August 2026, with the paper linked.

The full page is loading. Every number here is from a government paper.