AP Fact Check · తెలుగు

Is APTIDCO- Providing 1.30 MLD STP at the location of Murukumbatu-II at Chittoor in Chittoor District finished?

Chittoor sewage works: work going on, Chittoor. Cost as printed ₹4.78 crore. From AMRUT list, Union Housing and Urban Affairs Ministry, with the paper linked.

The full page is loading. Every number here is from a government paper.