Is Providing Water Supply to Takkellapadu WTP through pipe line in Guntur Municipal Corporation finished?
Guntur water supply: work going on, Guntur. Cost as printed ₹331.1 crore. From AMRUT list, Union Housing and Urban Affairs Ministry, with the paper linked.
- Providing Water Supply to Takkellapadu WTP through pipe line in Guntur Municipal Corporation
- Kind of work: Towns and cities
- Status in the record: Work going on
- Place: Guntur
- Cost as printed: ₹331.1 crore. This is the estimate in that paper, not money spent.
- Expected completion as printed: 1 March 2028
- Department: Urban Development — AMRUT 2.0 (MoHUA)
- Paper: AMRUT list, Union Housing and Urban Affairs Ministry
- More works in Guntur district
- Guntur urban works
- Tenali Pinapadu Pond
- Tenali Itha Nagar Pond
- Guntur water body works
The full page is loading. Every number here is from a government paper.