Rehabilitation and Upgradation to 2-lane with paved shoulders configuration of Koyyuru to Chaprathipalem section Km 120000 to Km 165500 of NH-516E in the State of Andhra Pradesh under Green National Highways Corridor Project Gnhcp with the loan assistance of World Bank on EPC mode: పూర్తయిందా?
NH-516E road works: పనులు జరుగుతున్నాయి, Asr (పాత పత్రంలో పేరు). ముద్రించిన వ్యయం ₹349.29 కోట్లు. ఆధారం: MoSPI report, August 2026.
- Rehabilitation and Upgradation to 2-lane with paved shoulders configuration of Koyyuru to Chaprathipalem section Km 120000 to Km 165500 of NH-516E in the State of Andhra Pradesh under Green National Highways Corridor Project Gnhcp with the loan assistance of World Bank on EPC mode
- పత్రంలో ముద్రించిన పేరు: Rehabilitation and Upgradation to 2-lane with paved shoulders configuration of Koyyuru to Chaprathipalem section Km 120000 to Km 165500 of NH-516E in the State of Andhra Pradesh under Green National Highways Corridor Project GNHCP with the loan assistance of World Bank on EPC mode
- పని రకం: రోడ్లు
- రికార్డులో స్థితి: పనులు జరుగుతున్నాయి
- ప్రాంతం: Asr (పాత పత్రంలో పేరు)
- ముద్రించిన వ్యయం: ₹349.29 కోట్లు. ఇది ఆ పత్రంలోని అంచనా, ఖర్చు చేసిన డబ్బు కాదు.
- ముద్రించిన భౌతిక పురోగతి: 98.1%
- ముద్రించిన పూర్తి గడువు: 2026 సెప్టెంబర్ 1
- శాఖ: Roads & Highways
- పత్రం: MoSPI report, August 2026
- 2020 ఆగస్టు 1 నుంచి 2026 ఆగస్టు 31 వరకు పత్రాలు రికార్డులో ఉన్నాయి
పూర్తి పేజీ లోడ్ అవుతోంది. ప్రతి అంకె ప్రభుత్వ పత్రం నుంచే.